← All Advisories
Reported from OT-Advisories.com as of

CVE-2026-80947

Last refreshed2026-10-19

Status: UPDATED  |  Advisory ID: CVE-2026-80947

Key Details

CVECVE-2026-80947
CVSS Score / Version
7.8 (High) / CVSS v3.1
Updated2026-10-19
CVSS Vector
CVSS:3.1/AV:L/AC:L/PR:L/UI:N/S:U/C:H/I:H/A:H
CVSS Prose
attack vector is local; attack complexity is low; privileges required is low; user interaction is none; scope is unchanged; confidentiality impact is high; integrity impact is high; availability impact is high.
Affected products
Linux Kernel

Affected Products, Subsystems & Sectors

VendorProductAffected VersionsPatch Status
LinuxLinux Kernel
SubsystemsOT Supporting Infrastructure
SectorsAll Sectors

What to Know

In the Linux kernel, the following vulnerability has been resolved:

wifi: rtl8xxxu: fix use-after-free from rx_urb_wq on stop

rtl8xxxu arms rx_urb_wq from the RX completion path:

rtl8xxxu_rx_complete() hands the URB to rtl8xxxu_queue_rx_urb(), which

queues it on rx_urb_pending_list and, once the list grows past

RTL8XXXU_RX_URB_PENDING_WATER, schedules rx_urb_wq. The worker

rtl8xxxu_rx_urb_work() drains rx_urb_pending_list, recovers priv through

container_of, and resubmits each URB through rtl8xxxu_submit_rx_urb(),

which anchors it on rx_anchor and dereferences priv->udev.

rtl8xxxu_stop() cancels the sibling work items (c2hcmd_work, ra_watchdog,

update_beacon_work) but never cancels rx_urb_wq, so a worker armed during

the last burst of RX traffic can run rtl8xxxu_rx_urb_work() after

rtl8xxxu_disconnect() has called ieee80211_free_hw(), which frees priv,

producing a use-after-free. The window opens under active RX traffic

(pending count above the watermark) followed by a disconnect.

There are two teardown races to close:

* rtl8xxxu_queue_rx_urb() decided whether to enqueue under rx_urb_lock

but called schedule_work() after dropping the lock. A completion

that observed shutdown == false and released the lock could then call

schedule_work() after rtl8xxxu_stop() had set shutdown and

cancel_work_sync() had already returned, arming the worker to run

after the teardown. Move schedule_work() under the same !shutdown

branch so the arming decision is atomic with the shutdown check.

* rtl8xxxu_rx_urb_work() anchors every URB it drained back onto

rx_anchor through rtl8xxxu_submit_rx_urb(). A worker still running

when usb_kill_anchored_urbs(&priv->rx_anchor) returned would submit a

URB that escaped the kill. In rtl8xxxu_stop(), call

cancel_work_sync(&priv->rx_urb_wq) before the kill so the worker is

drained first.

After priv->shutdown is set under rx_urb_lock, completions can no longer

queue rx_urb_wq. cancel_work_sync() then drains the last queued or running

worker, and the following usb_kill_anchored_urbs() kills the URBs it may

have submitted.

rtl8xxxu_disconnect() is covered because ieee80211_unregister_hw()

guarantees .stop() runs for a live interface before ieee80211_free_hw()

frees priv. The probe error path needs no cancel: rx_urb_wq is

INIT_WORK()'d there but cannot have been scheduled, since no URB is

submitted before ieee80211_register_hw() succeeds.

This bug was found by static analysis. (NVD)

What to Do

Monitor Linux's web page for any future patch releases.

References

SourceReference
NVDhttps://nvd.nist.gov/vuln/detail/CVE-2026-80947
CVEhttps://www.cve.org/CVERecord?id=CVE-2026-80947
Report compilation © 2026 OT-Advisories.com  ·  CC BY 4.0  ·  Source materials remain the property of their respective publishers as cited.